This was such an exciting and terrifying experience all at once. It was my first design for Hotel Impossible and a huge undertaking. The lobby was a hot mess of mismatched furnishing, with not one thought given to layout or space planning. The patio was designed for guests to use but was worn down with furniture actually falling apart! We were able to pull this project off thanks to lots of planning and hard work by the team at ST Sparks Construction. The Thomas Paul fabric that I used to cover the lobby wall was just so visual and stunning—it’s my absolute favorite part of this renovation.